8x4F — SolarEdge
Wrong AC connection
severity: stopconfidence: verifiedkind: error1 citation(s)
Scope: SolarEdge single-phase and three-phase inverters (Europe & APAC)
Meaning
The inverter reports that its AC connection is wrong: one phase is landed on the wrong terminal. The addendum's remedy is to switch between L1 and L2, or between L2 and L3, connections.
Likely causes
- L1 and L2 AC conductors swapped at the terminal block
- L2 and L3 AC conductors swapped at the terminal block
Checks
- Isolate the AC supply and confirm the L1/L2/L3 landing against the installation guide
- Swap L1 with L2, or L2 with L3, as required and re-commission the inverter
Safety flags
- grid_tie
Requires a qualified installer. Isolate and escalate to a qualified installer/electrician.
Parts
- AC terminal block
- AC wiring
Citations
type: manual · retrieved: 2026-11-21 · locator: p. 1
Wrong AC connection Switch between L1 and L2 or L2 and L3 connections