Scope: SolarEdge single-phase and three-phase inverters (Europe & APAC)
Meaning
An internal revenue-grade meter (RGM) error was reported. The addendum says to check the energy meter CT wiring.
Likely causes
- CT (current transformer) wiring reversed, open or loose
- CT ratio or meter configuration mismatch
Checks
- Check the Energy Meter CT wiring against the meter installation guide
- Confirm CT orientation and that all phases are wired
- Re-commission the meter and clear the error
Safety flags
- grid_tie
Requires a qualified installer. Isolate and escalate to a qualified installer/electrician.
Parts
- energy meter
- CTs
Citations
type: manual · retrieved: 2026-11-21 · locator: p. 5
Internal RGM Error Check, the Energy Meter CTs wiring.
Independent and unofficial. Verify against the manual for your exact model and serial number before acting. See this code on the owning surface: SolarDesk.