517 — Fronius

Change of master has taken place

severity: degradedconfidence: verifiedkind: error1 citation(s)

Scope: Fronius IG / IG Plus (IG 15-60, IG 2000/3000/4000/5100) grid-tied inverters

Meaning

A change of master occurred; possible transformer not connected, bridge short-circuit, or damaged intermediate-circuit detection.

Likely causes

Checks

Safety flags

Requires a qualified installer. Isolate and escalate to a qualified installer/electrician.

Citations

https://www.fronius.com/~/downloads/Solar%20Energy/Operating%20Instructions/42,0410,1089.pdf

type: manual · retrieved: 2026-11-21 · locator: p. 92

Change of master has taken place.
Independent and unofficial. Verify against the manual for your exact model and serial number before acting. See this code on the owning surface: SolarDesk.