222 — Fronius
Grid voltage L1/N below admissible limits
severity: degradedconfidence: verifiedkind: error1 citation(s)
Scope: Fronius IG / IG Plus (IG 15-60, IG 2000/3000/4000/5100) grid-tied inverters
Meaning
The phase L1-to-neutral grid voltage is too low; the inverter resumes when it returns to range.
Likely causes
- Low L1/N grid voltage
Checks
- Check grid voltage; contact the electrical contractor if it persists
Safety flags
- grid_tie
Requires a qualified installer. Isolate and escalate to a qualified installer/electrician.
Citations
https://www.fronius.com/~/downloads/Solar%20Energy/Operating%20Instructions/42,0410,1089.pdf
type: manual · retrieved: 2026-11-21 · locator: p. 84
Grid voltage (L1/N) below admissible limits
Independent and unofficial. Verify against the manual for your exact model and serial number before acting. See this code on the owning surface: SolarDesk.